Layout of the ISF (NSCL site upgrade option). This option makes use of the existing
NSCL infrastructure but requires demolition of the existing shop and assembly buildings and
new construction to accommodate these important infrastructure functions before major construction
of the ISF could begin. The scientific reach of this facility is similar to that illustrated in
Figure 1.12 for the initial south-campus option, but additional improvements will be much more